R--Plant-model Development for Sequoyah Nuclear Power
Agency
NUCLEAR REGULATORY COMMISSION.NUCLEAR REGULATORY COMMISSION.NUCLEAR REGULATORY COMMISSION
Location
—
Estimated Value
N/A
Type
Presolicitation
Service / NAICS
Technical Consulting
NAICS 541690
Opportunity Summary
This federal contract opportunity from NUCLEAR REGULATORY COMMISSION.NUCLEAR REGULATORY COMMISSION.NUCLEAR REGULATORY COMMISSION involves technical consulting. Responses are due by May 15, 2026 (42 days remaining).
Contract Description
TRAC/RELAP Advanced Computational Engine (TRACE) and Purdue Advanced Reactor Core Simulator (PARCS) Plant-model Development for Sequoyah Nuclear Power Plant. The U.S. Nuclear Regulatory Commission (NRC) is issuing a presolicitation notice for a requirement entitled, “TRAC/RELAP Advanced Computational Engine (TRACE) and Purdue Advanced Reactor Core Simulator (PARCS) Plant-model Development for Sequoyah Nuclear Power Plant.” In accordance with its mission to provide technical advice, tools, and information for meeting the needs of the U. S. Nuclear Regulatory Commission (USNRC), the USNRC’s Office of Nuclear Regulatory Research (RES) has committed to the continuous development of the thermal-hydraulic audit code, TRACE, and to the development of a collection of TRACE plant models, each repre...
Timeline
Posted Date
Apr 1, 2026
Response Deadline
May 15, 2026
42 days remaining
What Contractors Should Know
This falls under Technical Consulting (NAICS 541690), one of the core federal facilities and operational service categories.
Should You Pursue This?
Good Fit If…
- ✓You have direct experience in technical consulting
- ✓You have worked with NUCLEAR REGULATORY COMMISSION.NUCLEAR REGULATORY COMMISSION.NUCLEAR REGULATORY COMMISSION before
Harder to Win If…
- !Full and open competition — no set-aside restrictions
Related Context
Related Opportunities
A Case Study for Using A Systems Engineering Approach to Demonstrate Assurance Against Common Cause Failure in Operating and New/Advanced Reactor Technologies.
A Case Study for Using A Systems Engineering Approach to Demonstrate Assurance Against Common Cause Failure in Operating and New/Advanced Reactor Technologies.
7A--GoldSim Pro with Radionuclide Transport Module and GoldSim Pro with DP Plus
R--Software Integration for Environmental Radiologica
Contractor FAQ
How do I submit a bid for this NUCLEAR REGULATORY COMMISSION.NUCLEAR REGULATORY COMMISSION.NUCLEAR REGULATORY COMMISSION contract?
To bid on this opportunity, you must be registered in SAM.gov. Review the full solicitation documents available at SAM.gov, prepare your technical and cost proposals per the instructions, and submit before the response deadline of May 15, 2026.
Unlock Full Opportunity Intelligence
RecompeteIQ provides proprietary analysis that goes far beyond what SAM.gov shows. Create a free account to access:
Original listing: View on SAM.gov